BOREALIS – Kallo (Belgium): Waste Water Treatment System
IDRECO Water Treatment division got another success.
Borealis Company awarded to IDRECO the design, manufacturing, testing and delivery of the Waste Water
Treatment system for its Kallo site (Belgium).
This prestigious results , that come after the recent achievement of Contracts by other IDRECO Divisions,
once more confirm the high reliability of our Company for the supply of plants concerning a wide range of
industrial applications and sectors.
SNAM Rete Gas (Italy): No. 7 Thermocombustors for Gas Incineration
SNAM Rete Gas has awareded to IDRECO the Contract for the supply of thermocombustors to be installed
at Fiume Treste, Minerbio, Ripalta, Settala, Sabbioncello, Cortemaggiore and Sergnano sites.
The result has been achieved by the Industrial Division of IDRECO, specialized in the design and supply of
Industrial thermal systems and equipment as like as Thermocombustors, Incinerators, Waste-to-Energy
Systems and Rotary Kiln/Calciners.
The achieved result is a confirmation of Idreco’s engineering know how as well as its competence and
reliability in the design and supply of industrial infrastructures, capabilities well recognized and appreciated
by main national and international industrial players.
Duro Felguera (Spain): Ammonia Storage Systems for SCR Denitrification System
The Spanish Company Duro Felguera has awarded to Idreco the Contract for the design, fabrication and supply of the Ammonia Storage Systems as utilities for the SCR DeNOx systems at Power Plant Barranco de Tiraja, located at San Bartolomé de Tirajana, Gran Canaria and at Power Plant Granadilla de Abona, located at Santa Cruz de Tenerife, Spain.
The achieved result is a confirmation of Idreco’s engineering know how as well as its competence and reliability in the design and supply of industrial infrastructures, abilities well recognized and appreciated by important international Companies as like as Duro Felguera.
ENEL e-distribuzione (Italy): Antennas 169 MHz for 5G services
IDRECO Broadcasting & Telecommunication Division has been awarded by ENEL e-distribuzione by a
Contract for the supply of 43.200 antennas operating at 169 MHz to be installed in the Italian territory for 5G
technological services.
This achievement confirm IDRECO capability to approach and compete in challenges in new sectors other
than historical ones.
Nisu Project (Finland): Cobalt Sulphate Rotary Dryer
Idreco has been awarded the Contract for the design, manufacturing and supply of a Rotary Dryer for Cobalt
Sulphate application by the Joint Venture between JORD (Australia) and PROXA (South Africa) for the
NISU project located in Sotkamo, Finland. The Rotary Dryer has a capacity of 25 ton/day of dryed Cobalt Sulphate.
Delivery is scheduled for next February 2020. This achievement, once more, confirm the technical capability of IDRECO in the Rotary Dryers sectors for chemistry application and its own wide know-how applicable to several products.
Quaiza Potabilization system SWCC (Saudi Arabia): Bosster Pumps Water Cooling system
Idreco has been awarded the Contract for the execution of the Detail Engineering activities for the new
Water Cooling system to be installed in Quaiza Potabilization Plant in Saudi Arabia for the Potable Water
Booster Pumps
City of Pavia (Italy): Air Pollution Mitigation system
IDRECO, together with the University of Pavia and the Municipality of Pavia, has began the trial tests of its own Air Pollution Mitigation device, named PM Capturer, to reduce the air pollution of the selected urban area of City of Pavia with particular reference to PM10 and PM2.5.
The trial tests will stand 3 months.
This activity confirm once more the results of the R&D division of Idreco and its attention to the environmental protection issue, proposing new approach to safe the people health on open air areas.
City of Alessandria (Italy): Air Pollution Mitigation system
IDRECO, together with ARPA Piemonte and the Municipality of Alessandria, has began the trial tests of its own Air Pollution Mitigation device, named PM Capturer, to reduce the air pollution of the selected urban area of City of Alessandria with particular reference to PM10 and PM2.5.
The trial tests will stand 2 months.
This activity confirm once more the results of the R&D division of Idreco and its attention to the environmental protection issues, proposing new approach to safe the people health in open air areas.
Besmaya Thermal Power Plant phase 2 (Iraq): Condensate Filtration Packages
Delivery to the Iraqi site of Greek EPC Contractor J&P AVAX International Ltd. of the 2 Condensate Filtration Packages.
The 2 Packages have been designed, manufactured and delivered within the Contractual timeframe of 6 months.
This achievement confirm once more the reliability of Idreco to fulfill the taken commitments even on Contracts having very short time schedule.
ONT – Office National de la Télédiffusion (Tunisia): Carbon Black Dryers
IDRECO ha been awarded by Client with the Contract for the supply of FM measurement systems, FM scan and modulation with RDS interface with PC thorugh USB (USB FM Band Scanning, modulation & RDS Analyser).
The delivery of the goods has been completed in 3 months.