+ 39 0383 3371 info@idreco.com

The Greek EPC Contractor AVAX awarded to IDRECO the Contract for the supply of No. 2 Condensate Filtration Packages to be installed at Besmaya phase 3 Thermal Power Plant in Iraq. Each of the 2 Packages is equipped with 2 Filters each one designed to treat 1130 m3/h of Raw Condensate. Each of the 4 filters is equipped with high performance backwashable cartridge filtering elements.
The 2 Packages will be supplied as one-piece only, completely assembled on skid frame allowing an easy and fast on-site installation, as like as a “plug-in” installation.
This awarding is following the awarding of the same Packages to our company for Besmaya phase 2.
This is a demonstration of the high reliability and performance of the executed works for Besmaya PP phase 2, that has been successfully put in service.
The achieved result is a confirmation of Idreco’s engineering know how as well as its competence and reliability in the design and supply of industrial infrastructures, capabilities well recognized and appreciated by main national and international industrial players.