Wangtan
Client : DATANG INTERNATIONAL POWER GENERATION CO. LTD
Site : Wangtan (Hebei)
Country : China
Main Technical Data: Unit x MWe: 4 x 600 MW (two as option)
Flow each absorber: 2.376.054 Nm3/h dry
SO2 inlet: 4.458 mg/Nm3
Removal Efficiency: ≥ 95%
No. of absorbers: 4 (two as option)
Contract Year: 2004
Start-up Date: 2006-06