+ 39 0383 3371 info@idreco.com

Delivery to the Iraqi site of Greek EPC Contractor J&P AVAX International Ltd. of the 2 Condensate Filtration Packages.

The 2 Packages have been designed, manufactured and delivered within the Contractual timeframe of 6 months.

This achievement confirm once more the reliability of Idreco to fulfill the taken commitments even on Contracts having very short time schedule.